梯级水电站运行调度方式优化策略研究
Research on Optimization Strategy for Operation Scheduling of Cascade Hydropower Stations
陈倩1
作者信息
- 1. 大唐陕西发电有限公司石泉水力发电厂,陕西安康 725200
- 折叠
摘要
梯级水电站的生产运行需兼顾运营效益、水资源有效利用、生态环境保护、流域内防洪安全及灌溉供水等多重因素,这些因素对梯级水电站的运行调度方式产生了巨大影响.因此,结合梯级水电站运行调度方式的发展现状及需求,探索了梯级水电站运行调度方式的优化策略,可为保障梯级水电站运行安全、提高运营效益提供参考和借鉴.
Abstract
The production and operation of cascade hydropower stations must not only consider operational effi-ciency but also take into account factors such as effective water resource utilization,ecological environmental pro-tection,flood control safety within the basin,and irrigation water supply,all of which have a significant impact on the operation scheduling of cascade hydropower stations.Therefore,this paper explores optimization strategies for the operation scheduling of cascade hydropower stations based on the current development status and future needs of these stations.The study aims to provide references and insights for ensuring the safe operation of cas-cade hydropower stations and improving operational efficiency.
关键词
梯级水电站/运行调度方式/优化策略Key words
cascade hydropower station/operation scheduling method/optimization strategy引用本文复制引用
出版年
2024