新建电气化铁路隧道预埋槽道施工问题整改方案探讨

扫码查看
通过对电气化铁路隧道预埋槽道施工普遍存在的问题进行详细排查分类,分析问题产生的原因,提出了根据现场预埋槽道施工缺陷类型分类整治、科学研判槽道施工缺陷类型并精准施策的措施方案.通过几种方案的综合分类应用,提高了隧道预埋槽道整治工作效率及整治工程质量,减少整治工程费用,施工工期及质量得到有效保障.
By conducting detailed classification and sorting of common problems existed in construction of pre-embedded channels in tunnel of electrified railway,measures and schemes for treatment of classified construction defects of pre-embedded channels at site,scientific judgment of types of construction defects and accurate implementation of measures are put forward.The comprehensive classification and application of several schemes improve the working efficiency and engineering quality of treatment of pre-embedded channels in the tunnel,reduce the engineering costs and guarantee the construction schedule and quality.

pre-embedded channel in tunnelscheme of treatmentquality control measure

郭骏麟、赖志强

展开 >

中国铁路南昌局集团有限公司福州供电段

东南沿海铁路福建有限责任公司

隧道预埋槽道 整治方案 质量控制措施

2024

电气化铁道
中铁电气化局集团有限公司,中国铁道学会电气化委员会

电气化铁道

影响因子:0.272
ISSN:1007-936X
年,卷(期):2024.35(6)