首页|朝上盾构施工引起土体变形的数值模拟研究

朝上盾构施工引起土体变形的数值模拟研究

扫码查看
朝上掘进盾构机从水平隧道始发向上掘进过程中,会导致周边土体变形.采用三维有限元模拟软件MIDAS GTS NX对过程进行建模,利用网格激活钝化、改变网格参数与属性的方法,模拟朝上掘进盾构施工的实际过程,得到隧道周边土体的变形规律,研究不同竖向隧道长度、不同朝上盾构掘进速度等因素对土体变形造成的影响.研究结果表明,在朝上掘进盾构的掘进过程中,地表土体离竖井中心点距离越近,其沉降呈现出先增加后减少,甚至隆起的情况,水平位移相比于竖向位移改变量较小;竖向隧道长度越长,土体及水平隧道因盾构向上掘进产生的扰动就越大;而施工时朝上盾构掘进速度越慢,对于土体的竖向扰动影响就越小.
NUMERICAL SIMULATION ON THE SOIL DEFORMATION CAUSED BY UPWARD SHIELD CONSTRUCTION
The shield tunneling machine often leads to the deformation of the surrounding soil during the upward shield tunneling process starting from the horizontal tunnel.A numerical model is established by using the MIDAS GTS NX software.Through activating or passivating the grid and changing the parameters and attributes of the grid,the actual process of upward shield tunneling construction is simulated.The deformation law of the soil around the tun-nel is obtained,and the influence of different vertical tunnel lengths,different upward shield tunneling speeds,and other factors on the soil deformation is studied.The results show that the settlement of the soil surface increases first and then decreases,even with upheaves.When the surface soil is closer to the center of the shaft,the change of hori-zontal displacement is smaller than that of vertical displacement.Moreover,the longer the length of the vertical tun-nel,the greater the disturbance of soil and horizontal tunnel caused by upward shield tunneling.Furthermore,the slow-er the upward shield tunneling speed is during construction,the influence of vertical disturbance on soil is smaller.

upward excavationnumerical simulationshield tunnelsoil deformation

周彦臣、魏纲、陶柏丞、李奕彤、王霄

展开 >

浙大城市学院土木工程系,杭州 310015

朝上掘进 数值模拟 盾构隧道 土体变形

国家自然科学基金项目

52308421

2024

低温建筑技术
黑龙江省寒地建筑科学研究院

低温建筑技术

影响因子:0.237
ISSN:1001-6864
年,卷(期):2024.46(2)
  • 15