首页|大体积混凝土跳仓法施工的数值模拟分析

大体积混凝土跳仓法施工的数值模拟分析

扫码查看
大体积混凝土采用跳仓法施工技术进行地下结构混凝土浇筑,可以有效控制混凝土裂缝出现、避免地下结构混凝土渗漏.以宁波国际会议中心大体积混凝土跳仓法施工为例,采用COMSOL软件对大体积混凝土水化热温度场进行模拟计算与分析,计算结果表明,采用跳仓法施工技术进行混凝土分仓分段浇筑能大大降低温度应力,使混凝土温度应力远远小于抗拉强度,有效降低混凝土开裂风险;各仓位的底板浇筑将导致相邻仓位的混凝土温度部分提高,但总体影响不大,底板最高温度位于45℃附近,不超过可能引起延迟钙矾石反应的55℃上限,满足标准要求,体现了跳仓法施工在工程中的应用效果.
NUMERICAL SIMULATION ANALYSIS OF LARGE VOLUME CONCRETE CONSTRUCTION BY SEQUENCE METHOD
The concrete pouring of underground structure is carried out by using the construction technology of jumping warehouse method,which effectively control the occurrence of concrete cracks and avoid the leakage of un-derground structure concrete. Taking a project of the construction of mass concrete as the case,the hydration heat temperature field of mass concrete is simulated and analyzed by COMSOL software. The calculation results show that the temperature stress are reduced by using the construction technology of the jump method. The concrete tem-perature stress is much smaller than the tensile strength,and the risk of concrete cracking is effectively reduced. The pouring of the bottom plate of each warehouse leads to a partial increase in the concrete temperature of the adja-cent warehouses,but the overall impact is not significant. The maximum temperature of the bottom plate is near 45 ℃,which reflects the application effect of the jump warehouse construction method in the project. At the same time,the maximum temperature of the bottom plate is near 45℃,which does not exceed the upper limit of 55 ℃ that may cause delayed ettringite reaction,meeting the standard requirements.

underground structure concretejumping warehouse method constructionconcrete cracking

赵军、孙兆华、刘天奇、余少乐、张玉建、卫林强

展开 >

宁波开投置业有限公司,浙江宁波315100

中国建筑第八工程局有限公司,上海200120

地下结构混凝土 跳仓法施工 混凝土开裂

2024

低温建筑技术
黑龙江省寒地建筑科学研究院

低温建筑技术

影响因子:0.237
ISSN:1001-6864
年,卷(期):2024.46(4)
  • 2