The HT-6M Tokamak Reconstruction is an international project of cooperation between China and Thai-land for responding to the Belt and Road Initiative.The function of pulse power supply for heating field is to breakdown and produce plasma,and the corresponding power supply scheme adopts the form of capacitor energy storage pulse dis-charge.To calculate the parameters of power supply that meet the requirements,the discharging process of pulse power supply for heating field is analyzed mathematically,and the core devices are designed and developed according to working parameters of power supply equipment.To verify the theoretical analysis of discharging process,a set of small capacitor energy storage pulse power supply was developed.At the same time,a turn-off experiment on a high-power solid-state cir-cuit breaker was carried out.
关键词
HT-6M/电容储能/脉冲电源/大功率固态断路器
Key words
HT-6M/capacitor energy storage/pulse power supply/high-power solid-state circuit breaker