Analysis of Construction Plan for 110kV Prefabricated Cabin Substation
This paper expounds a construction plan for a 110kV prefabricated cabin substation.This plan includes the design,equipment selection,construction,and operation management of prefabricated cabin substations,involving electrical,structural,plumbing,HVAC engineering,and has the complexity and comprehensiveness of the project.
prefabricated substationequipment selectiondesign and constructionoperation management