Design and Evaluation of Optimization Scheme for Start up Load Increase Rate of M701F3 Combined Cycle Unit
This paper describes the necessity and feasibility of optimizing the hot start mode of the M701F3 combined cycle unit in the first phase of a power plant.It explores the design and testing of optimization schemes for the rate of load increase after hot start of the unit,and based on multiple test results,summarizes specific optimization schemes and evaluates their impact.