电站系统工程2024,Vol.40Issue(1) :29-31.

600 MW火电机组引风机RB动作异常分析及控制策略优化

Analysis of Abnormal IDF RB Function in 600MW Thermal Power Unit and Optimization of Control Strategy

黄章建 罗谢超 林远征
电站系统工程2024,Vol.40Issue(1) :29-31.

600 MW火电机组引风机RB动作异常分析及控制策略优化

Analysis of Abnormal IDF RB Function in 600MW Thermal Power Unit and Optimization of Control Strategy

黄章建 1罗谢超 1林远征1
扫码查看

作者信息

  • 1. 国能(福州)热电有限公司
  • 折叠

摘要

阐述了某600 MW火电机组引风机RB动作异常的原因及处理过程.通过对RB异常的原因进行详细分析,即RB期间燃料主控输出(给煤机总指令)降至0 t/h,并针对这异常提出了相应的解决方案,有效地提高了 RB动作成功率和动作的合理性,提高了机组的运行效率.

Abstract

The causes and treatment process of the abnormal operation of the induced draft fan(IDF)RB function of a 600MW thermal power unit is explained.Through analysis of the reasons for RB abnormality,which refers to the decrease of fuel control output to 0 t/h during RB period,and corresponding solutions were proposed to effectively improve the success rate and rationality of RB operation,thereby improving the operating efficiency of the unit.

关键词

引风机/RB/控制逻辑/优化

Key words

induced draft fan(IDF)/RB function/control logic/optimization