For the coal power units using selective catalytic reduction method denitration,limited by the low flue gas temperature,denitration cannot be put into operation in the unit start-stop process and the low load section.By analyzing the full load denitrification technology and practical results of a 1000MW secondary reheat unit,the full load denitrification control strategy suitable for large capacity coal-fired units is explored,so as to provide reference for similar units in China.
full loaddenitrationflue gas temperaturewater bypasseconomizerdepth peak regulation