Optimization of Coal Bunker Loose Device in Oversea 660MW Coal-fired Plant
The optimization research of the loose devices installed at the bottom of 12 coal bunkers in a 660MW coal-fired power plant abroad is carried out.Three treatment schemes are compared and analyzed in terms of basic principles,power consumption,gas consumption,etc.aspects in terms of feasibility and economy,so that understand the advantages and disadvantages of the three schemes.