福建建筑2024,Vol.310Issue(4) :86-94.

厦门某大底盘双塔复杂超限高层结构设计分析

Analysis on the Design of complex high-rise structure with large chassis and twin towers in Xiamen

何波
福建建筑2024,Vol.310Issue(4) :86-94.

厦门某大底盘双塔复杂超限高层结构设计分析

Analysis on the Design of complex high-rise structure with large chassis and twin towers in Xiamen

何波1
扫码查看

作者信息

  • 1. 厦门上城建筑设计有限公司 福建厦门 361000
  • 折叠

摘要

厦门嘉丽广场项目建筑业态复杂.为充分实现建筑功能需求,结构未断缝,未设后浇带,形成大底盘双塔建筑;结构存在多塔、扭转不规则、楼板不连续、尺寸突变、塔楼偏置、局部斜柱和穿层柱、大跨度等多项不规则.设计进行了多种软件、多种模型的计算分析比较,重点对比整体与分塔模型的各指标变化情况,通过概念判断,与计算分析相结合,对结构关键和薄弱部位有针对性地采取措施.同时,采用SAUSAGE大震动力弹塑性时程分析,结构达到了预期的抗震性能目标.为此,对结构设计中的主要问题进行分析总结,供相关工程技术人员参考.

Abstract

Xiamen Jiali Plaza project is a complex building.In order to fully realize the functional requirements of the building,the structure is not broken,and there is no post-pouring belt,forming a large chassis and twin tower building.The structure has many irregularities,such as multi-tower,torsional irregularity,floor discontinuity,dimensional mutation,tower bias,local inclined column and through-storey col-umn,and large span.A variety of software and a variety of models were calculated and compared in the design,and the changes of each in-dex of the whole model and the sub-tower model were compared emphatically.Through the combination of concept judgment and calcula-tion analysis,the key and weak parts of the structure were targeted to take measures,and the structure achieved the expected seismic per-formance target by SAUSAGE dynamic elastic-plastic time history analysis.This paper analyzes and summarizes the main problems in structural design for reference of engineering and technical personnel.

关键词

大底盘双塔/对比分析/性能设计/动力弹塑性时程分析

Key words

Big chassis with twin towers/Comparative analysis/Performance design/Dynamic elastoplastic time history analysis

引用本文复制引用

出版年

2024
福建建筑
福建省土木建筑学会

福建建筑

影响因子:0.379
ISSN:1004-6135
段落导航相关论文