首页|某滨海项目克服不良地质条件的建筑设计策略研究

某滨海项目克服不良地质条件的建筑设计策略研究

扫码查看
通过深入某滨海项目的设计实践与分析,探讨如何通过建筑设计策略,克服不良地质条件对建筑项目的影响.该项目位于填海造陆区域,存在不良地质条件,土层薄弱复杂,导致产生严重的地面沉降问题.文章首先分析地面沉降对建筑项目的影响.随后,将研究对象分为建筑主体、建筑主体之间、建筑主体与室外的连接部位以及室外总体三大类,详细列举各类构件和部位易受地面沉降破坏的问题.文章进一步以案例项目为例,探讨相应的建筑设计策略,总结研究不良地质条件下建筑设计策略的重要性,并提出未来的研究方向.
Research on the Architectural Design Strategies to Overcome Adverse Geological Conditions in a Coastal Project
This paper delves into the design practice and analysis of a coastal project to study how architectural design strategies can over-come the impact of adverse geological conditions on projects.The project is located in a reclaimed land area,characterized by weak and complex soil layers,which lead to severe ground settlement issues.The paper begins by analyzing the impact of ground settlement on pro-jects.Sequently,the research subjects are categorized into three major types:the main body of the building,the connections between the main bodies of the building and the outdoor areas,then the outdoor areas.it details the issues that various parts are prone to damage due to ground settlement.Then use a case study project to discuss corresponding architectural design strategies.The study summarizes the im-portance of architectural design strategies under adverse geological conditions and proposes directions for future research.

Adverse geological conditionsGround subsidenceArchitectural designConstructional measures

陈航宇

展开 >

福建省建筑设计研究院有限公司 福建福州 350001

不良地质条件 地面沉降 建筑设计 构造措施

2024

福建建筑
福建省土木建筑学会

福建建筑

影响因子:0.379
ISSN:1004-6135
年,卷(期):2024.311(5)