The impact assessment of hybrid pumped storage power station construction on biodiversity——taking Fujian Gutian creek hybrid pumped storage power station as an example
The impact assessment of hybrid pumped storage power station construction on biodiversity——taking Fujian Gutian creek hybrid pumped storage power station as an example
In view of the construction characteristics of the hybrid pumped storage power station project in Gutian Creek,Fujian,on the basis of exploring the background information,distribution pattern,interspecific interaction,and dynamic trends of biodiversity in the im-pact assessment area and occupied area,analyzing the impact of project construction and operations on local biodiversity,the results showed the impact of project construction and operation on local biodiversity was at a medium to low impact level.And feasible measures to mitigate the impact of project construction on the assessment area are proposed to minimize the impact of project construction on the biodiversity of the natural reserve.It provides a scientific basis for the decision-making of Gutian Artificial Lake Nature Reserve authori-ties.