Dual Power Supply Switching Test for Transmitter and Suggestions for Transmitting System Construction
This paper studies the changes in the working state of the transmitter during the switching of the power supply with the power control level automatic transfer switching equipment,aiming to improve the construction scheme of the radio and television transmission system and improve the stability of the system.By testing the data of power loss and self-recovery time of various commonly used transmitters when using the power control level automatic transfer switching equipment automatically and manually switching from primary to secondary power supply.This study demonstrates the impact of power switching speed on whether the transmitter stops broadcasting and the duration of resuming broadcasting and proposes some suggestions for the construction of the transmission system.
Dual power automatic transfer switchTransmitterSelf-recovery timeSystem construction