V型起爆技术在复杂环境下房屋拆除爆破中的应用

扫码查看
针对滕鹏飞 12 层违建房首层为框架剪力墙、2-12 层为框架结构且周边环境复杂,倒塌范围受限的情况,决定设计一个 10m高的爆破切口,向南定向倒塌.采用对首层剪力墙进行机械预拆除,保留横梁下面的剪力墙、变墙为柱,合理确定了每个楼层爆破切口高度及墙、柱爆破参数.为避免爆破有害效应对东侧在建房屋以及北侧木房子产生安全影响,本次起爆网路采用中间先响两边后响的电子雷管 V型起爆网路;每发雷管入孔前合理设定延时时间,对爆破墙、柱采用多层防护措施;通过精心设计和施工,大楼按设计要求依次倒塌、有效控制爆破危害效应,可为同类工程提供经验.
Application of V-shaped blasting technology in the demolition blasting of buildings under complex environment
In view of the situation that Teng Pengfei 12-story illegal building first floor is a frame shear wall,the second to the 12-story illegal building is a frame structure,and the surrounding environment is complex,and the scope of collapse is limited,it is decided to design a 10 m high blasting cut,and the directional collapse is to the south.By means of mechanical pre-demolition of the first floor shear wall,retaining the shear wall under the crossbeam and changing the wall into a column,the blasting cut height and the blasting parameters of the wall and column for each floor are reasonably determined.In order to avoid the harmful effects of blasting have a safety impact on the east side of the house under construction and the north side of the wooden house,the initiation network used a v-shaped network of electronic detonators that ring first on each side and then on the other;the delay time should be set reasonably before each detonator enters the hole and multi-layer protective measures are adopted for blasting walls and columns;through careful design and construction,building collapse in turn according to the design requirements and the blasting damage effect is effectively controlled,which can provide experience for similar projects.

electronic detonatordemolition blastingcomplex environment

伍锡南、聂群富、夏多马

展开 >

湖南南岭民爆工程有限公司,长沙 410205

电子雷管 拆除爆破 复杂环境

2024

工程爆破
中国工程爆破协会

工程爆破

CSTPCD北大核心
影响因子:0.848
ISSN:1006-7051
年,卷(期):2024.30(1)
  • 9