工程地质学报2025,Vol.33Issue(1) :302-314.DOI:10.13544/j.cnki.jeg.2022-0756

青岛胶州湾第二海底隧道主要不良地质与施工风险分析

PRIMARY UNFAVORABLE GEOLOGY AND CONSTRUCTION RISKS OF THE SECOND SUBSEA TUNNEL OF JIAOZHOU BAY IN QINGDAO CITY

李志强 薛翊国 曲立清 孙文昊 刘洪亮 赵世森
工程地质学报2025,Vol.33Issue(1) :302-314.DOI:10.13544/j.cnki.jeg.2022-0756

青岛胶州湾第二海底隧道主要不良地质与施工风险分析

PRIMARY UNFAVORABLE GEOLOGY AND CONSTRUCTION RISKS OF THE SECOND SUBSEA TUNNEL OF JIAOZHOU BAY IN QINGDAO CITY

李志强 1薛翊国 2曲立清 3孙文昊 4刘洪亮 1赵世森5
扫码查看

作者信息

  • 1. 山东大学岩土与结构工程研究中心,济南 250061,中国
  • 2. 山东大学岩土与结构工程研究中心,济南 250061,中国;中国地质大学(北京)工程技术学院,北京 100083,中国
  • 3. 青岛国信发展(集团)有限责任公司,青岛 266000,中国
  • 4. 中铁第四勘察设计院集团有限公司,武汉 430063,中国
  • 5. 中国矿业大学深部岩土力学与地下工程国家重点实验室,徐州 221116,中国
  • 折叠

摘要

青岛胶州湾第二海底隧道是我国目前在建的最长的公路海底隧道,为了保障隧道安全建设,本文在文献调研和现场实践的基础上,针对胶州湾第二海底隧道中主要不良地质及其作用下的主要施工风险进行了研究.研究发现:胶州湾第二海底隧道地理环境特殊,主要不良地质为活动断裂带、软硬不均地层及富水断层破碎带.海底隧道采用钻爆法和盾构法穿越上述不良地质过程中存在突涌水、断层破碎带塌方、地面塌陷,盾构卡机、盾构与钻爆海中对接及接收、超大海底盾构接收洞室施工等工程风险及挑战.同时,隧道沿线地上建筑复杂,必须重视爆破施工/地表沉降对居民建筑、油港码头及输油管线的影响,工程施工中一定要高度重视上述不良地质及其可能诱发的工程风险.最后,针对上述问题提出了相应的工程对策与建议,建议在海底隧道风险评估、不良地质超前预报、活动断裂带安全控制、海洋环境保护、海底隧道应急救援技术体系,超大断面海底隧道施工控制等方面系统开展科研攻关.研究成果可为设计、施工提供科学依据,保障隧道施工安全,进而填补我国深长海底隧道修建核心关键技术空白,为后续建设的超长海底隧道提供依据.

Abstract

The second subsea tunnel of Jiaozhou Bay(SSTJB)is now the longest highway subsea tunnel under con-struction in China.To ensure tunnel construction safety,this article summarized the primary unfavorable geology and analyzed the corresponding construction risks of SSTJB based on the literature review and field practices.The results showed that the geological condition of SSTJB was very complicated.Specifically,the primary unfavorable geology includes an active fault belt,soft and hard strata,and water-rich faults.When the subsea tunnel excavates in the above unfavorable geology by borehole-blasting method and shield method,there are the risks of water in-rush,collapse,surface subsidence,shield jamming,docking and receiving of the shield machine,and construction of oversized receiving chamber.Moreover,the influence of the blast and surface subsidence on residential build-ings,oil ports,and oil transportation pipelines also should be paid enough attention.During the construction,spe-cial attention must be paid to unfavorable geology and possibly induced engineering risks.Finally,the paper pro-posed corresponding engineering suggestions and research countermeasures for the above problems.It is suggested that scientific research should be carried out systematically in advanced prediction of unfavorable geology,safety control of passing the active fault belt,marine environment protection,risk assessment,emergency rescue technolo-gy system,and construction control of the super large cross-section etc.The relevant research can provide scientific basis for design and construction,and ensure tunnel safety during construction.Furthermore,it fills the core and key technical gap in the construction of deep and long subsea tunnels in China,and provides a basis for the subse-quent construction of ultra-long subsea tunnels.

关键词

海底隧道/不良地质/活动断裂/施工风险/工程建议

Key words

Subsea tunnel/Unfavorable geology/Active fault/Construction risk/Engineering suggestions