多层成片住宅项目的水平周转流水施工
Horizontal Turnover and Flow Construction of Multi-Storey Block Residential Project
邓力浩 1杨学康 1吴少松1
作者信息
- 1. 中国建筑第二工程局有限公司华南分公司,广东 深圳 518048
- 折叠
摘要
多层成片式住宅项目具有体量大、密度高等特性,其施工部署尤为重要.以实际项目为例,对山地地形的施工组织,施工现场的场平布置,材料周转供应的合理规划,施工主线的划分确定,进行整体性、合理性的分析.
Abstract
Multi-storey piecemeal residential projects have the characteristics of large volume and high density,and their construction deployment is particularly important.Taking the actual project as an example,the construction organization of mountain terrain,the layout of the construction site,the reasonable planning of material turnover supply,and the division and determination of the main construction line are analyzed as a whole and rationality.
关键词
山地地形/多层成片住宅/材料周转供应/施工部署Key words
mountainous terrain/multi-storey residential buildings/material turnover supply/construction deployment引用本文复制引用
出版年
2023