工程建设与设计2023,Issue(24) :142-144.DOI:10.13616/j.cnki.gcjsysj.2023.12.247

探析公路桥梁施工中的挂篮悬浇施工技术应用

Discussion on the Application of Hanging Basket Hanging Pouring Construction Technology in Highway Bridge Construction

赵斌
工程建设与设计2023,Issue(24) :142-144.DOI:10.13616/j.cnki.gcjsysj.2023.12.247

探析公路桥梁施工中的挂篮悬浇施工技术应用

Discussion on the Application of Hanging Basket Hanging Pouring Construction Technology in Highway Bridge Construction

赵斌1
扫码查看

作者信息

  • 1. 聊城市公路事业发展中心高唐公路事业发展中心,山东高唐 252800
  • 折叠

摘要

以某特大型桥梁施工项目为研究案例,根据桥型结构布置方案选用前支点挂篮+悬臂浇筑施工技术方案,落实不同工况下桥梁主要构件应力分布情况的验算,证明施工方案设计的合理性与可靠性.在此基础上,分别围绕挂篮安装、堆载预压、挂篮前移、结构调整与悬浇作业5 个环节梳理现场施工技术要点.最终桥梁变形监测结果表明,该桥梁各测点的沉降量均控制在允许范围内,符合施工质量要求.

Abstract

Taking an extra-large bridge construction project as a case study,according to the bridge structure layout scheme,the front fulcrum hanging basket+cantilever pouring construction technology scheme is selected to implement the checking calculation of the stress distribution of the main components of the bridge under different working conditions,which proves the rationality and reliability of the construction scheme design.On this basis,the main technical points of site construction are sorted out respectively around five links:hanging basket installation,pile preloading,hanging basket forward,structure adjustment and suspension pouring.The final deformation monitoring results show that the settlement amount of each measuring point of the bridge is controlled within the allowable range and meets the construction quality requirements.

关键词

公路桥梁/斜拉桥/挂篮悬浇/斜拉索布置/变形监测

Key words

highway bridge/cable stayed bridge/hanging basket hanging pouring/stay cable arrangement/deformation monitoring