铁路桥钢梁与钢筋混凝土板结合梁施工技术

Construction Technology of Steel Beam and Reinforced Concrete Slab Combined Beam of Railway Bridge

王心雨
工程建设与设计2023,Issue(24) :181-183.DOI:10.13616/j.cnki.gcjsysj.2023.12.260

铁路桥钢梁与钢筋混凝土板结合梁施工技术

Construction Technology of Steel Beam and Reinforced Concrete Slab Combined Beam of Railway Bridge

王心雨1
扫码查看

作者信息

  • 1. 中国土木工程集团有限公司,北京 100038
  • 折叠

摘要

结合具体工程实例,阐述了钢筋混凝土板结合梁预制方法,介绍了临时支墩及支架拼装方案,对钢梁与钢筋混凝土板结合梁施工中的钢梁梁段拼装、高强螺栓安装检测、钢筋混凝土板结合梁安装等施工技术要点展开了详细的研究,并详细探讨了桥面板施工技术,以提高钢梁与钢筋混凝土板结合梁施工效率,确保桥梁整体施工质量,促进铁路桥梁工程事业长远发展.

Abstract

Combined with concrete engineering examples,this paper expounds the precast method of reinforced concrete slab combined beam,introduces the assembly scheme of temporary piers and supports,and carries out a detailed study on the construction technical points of steel beam section assembly,high-strength bolt installation and detection,and reinforced concrete slab combined beam installation in the construction of composite beam.The bridge panel construction technology is discussed in detail to improve the construction efficiency of steel beam and reinforced concrete slab combined beam,ensure the overall construction quality of bridge,and promote the long-term development of railway bridge engineering.

关键词

铁路桥梁/钢筋混凝土板/预制构件/拼装技术

Key words

railway bridge/reinforced concrete slab/prefabricated components/assembly technology