Combined with a standard plant renovation project,this paper introduces the multi-scheme transformation of steel structure standard plant in detail.The project overview and renovation requirements were analyzed,the differences between the renovation design and the original design were compared,and the reinforcement scheme was designed and calculated.In the case of the project,it was difficult to meet the transformation requirements with conventional reinforcement means,and the optimal renovation scheme was finally selected.
关键词
标准厂房/锂电池工厂/改造加固/方案分析/加固方法
Key words
standard factory building/lithium battery factory/renovation and reinforcement/plan analysis/reinforcement methods