Study on Construction Scheme of Lifting and Reconstruction of Sluice Dam
Combined with the upgrading and renovation projects of 4 river blocking dams(Xiashizha Dam,Wuqi bridge rubber dam,Dongmen bridge rubber dam and Wanggongtan rubber dam)in a certain reach of Pingxiang,the current situation of river blocking dams is introduced,the axis of corresponding landscape dams is analyzed and determined,and three landscape dam upgrading and renovation projects are proposed.Through comparative analysis,the final construction plan is determined,and the purpose of improving the water environment of the river is achieved.