Combining with the engineering example,this paper analyzes the treatment principle of soft soil roadbed,compares various treatment schemes,and finally selects the"high vacuum drainage+dynamic compaction method".Then,the application points of vacuum drainage and dynamic compaction are analyzed and the post construction settlement was monitored.
high vacuum drainagedynamic compaction methodsoft soil subgradepost construction settlementapplication effect