Study on Cantilever Cast-in-Place Construction and Quality Control of Prestressed Concrete Continuous Beam Bridge
Combined with the construction project of a prestressed concrete continuous bridge,the key technology application of 0#block construction in cantibeam construction,cantilever section and hanging basket construction and span closing in bridge is analyzed and studied,and the concrete application of cantilever construction quality control is analyzed from the two aspects of bridge beam linear control and stress monitoring.
continuous beam bridgecast-in-situ cantilever0#block constructionlinear controlstress monitoringapplied research