首页|探究建筑工程管理的制约因素及应对措施

探究建筑工程管理的制约因素及应对措施

扫码查看
研究了建筑工程管理的特征、制约因素与应对措施,在掌握建筑工程管理特征的基础上,从合同管理缺乏科学性、成本管理不足、进度管理制约性、技术应用不足 4 个方面,分析了当前建筑工程管理的制约因素,同时,提出了强化合同管理、加强成本管理、施工进度管理策略、合理应用技术手段的应对措施,有助于转变传统工程管理模式,确保工程建设顺利进行,以达到高质量的施工目标,推动行业可持续发展.
Exploration on the Restrictive Factors and Countermeasures of Construction Project Management
This paper studies the restrictive factors and countermeasures of construction project management,and analyzes the restrictive factors of current construction project management from four aspects:lack of scientificity of contract management,lack of cost management,limitation of schedule management and lack of technology application on the basis of mastering the characteristics of construction project management.At the same time,the countermeasures of strengthening contract management,strengthening cost management,formulating construction schedule management strategies,and rational application of technical means are put forward,which help to change the traditional project management mode,ensure the smooth construction of project construction,achieve high-quality construction objectives,and promote the sustainable development of the industry.

construction engineeringmanagementrestriction factorscountermeasures

蔡志军

展开 >

华润置地有限公司,广东 深圳 518000

建筑工程 管理 制约因素 应对措施

2025

工程建设与设计
国家机械工业局工程建设中心 中国机械工业勘察设计协会 中国中元国际工程公司

工程建设与设计

影响因子:0.494
ISSN:1007-9467
年,卷(期):2025.(1)