首页|具有位置相关权重的工期分配排序问题研究

具有位置相关权重的工期分配排序问题研究

扫码查看
针对具有位置相关权重的工期分配排序问题进行了研究,其目标是在共同工期分配/松弛工期分配两种模式下,找到最优的工件加工序列以极小化工件工期与工件延误的线性加权和,其中权重是与位置相关的权重.通过证明一系列性质得到工期的计算方法,进而将所要研究的两类工期分配问题转换为与工件加工时间有关的函数.根据每个工件对应的系数来给出具体求解算法从而得到最优的工件序列,以及对应的最优共同工期/最优松弛工期.通过具体的算例验证了此算法可在多项式时间内求解.
Research on Due Date Assignment Scheduling Problems with Position-dependent Weights
In this paper,the scheduling problems for due date assignment with position-dependent weights are studied.The goal is to find the optimal job processing sequence in two modes of common/slack due date assignment with the linear weighted sum of minimal due date and tardiness,where the weights are position-dependents weights.By proving a series of properties,the calculation methods of due date are obtained,and then the two kinds of due date assignment problems are transformed into functions related to job processing time.According to coefficient corresponding to each job,the specific solution algorithms are given to obtain the optimal job sequence,and the corresponding optimal common/slack due date.The algorithms are verified to solve the problems in polynomial time by numerical examples.

position-dependent weightsschedulingcommon/slack due datetardiness

吕丹阳、王吉波

展开 >

沈阳航空航天大学机电工程学院,沈阳 110136

沈阳航空航天大学理学院,沈阳 110136

位置相关权重 排序 共同/松弛工期 延误

国家自然科学基金辽宁省"兴辽英才计划"项目

71471120XLYC2002017

2024

工程数学学报
西安交通大学

工程数学学报

CSTPCD北大核心
影响因子:0.302
ISSN:1005-3085
年,卷(期):2024.41(2)
  • 20