The main meaning of EPC and DB internationally is based on a total price contract,using a lump sum or adjustable total price approach to stimulate the general contractor's motivation to optimize design,achieve deep integration of design,procurement,construction and other stages of work,and achieve the goal of reducing costs,shortening construction periods,and optimizing resource allocation.There is no in-depth distinction between the connotations of FPC and DB in domestic regulations,especially the lack of unified settlement principles.As a result,many engineering general contracting projects have actually been made into DBB,and there is a lot of controversy,leading to difficulties in contract performance and a decrease in performance efficiency.The establishment of rules for the two modes of engineering general contracting is no longer urgent.The article believes that domestic engineering general contracting should establish separate systems according to the EPC and DB models,clarify their respective connotations and rules.By comparing and analyzing the connotations of the two internationally recognized models,this article explores the establishment of rules suitable for China's national conditions and proposes suggestions for improving China's engineering general contracting management system.This will help establish standard contract formats corresponding to the two models in the future,reduce the social costs of operating the engineering general contracting model.
关键词
EPC/DB/工程总承包/规则对比
Key words
EPC/DB/Engineering general contracting/Rules compare