某项目基坑支护预警后应急处理措施及效果分析

Analysis of Emergency Response Measures and Effects After Early Warning of Foundation Pit Support in a Certain Project

杨杰 方威威
工程质量2025,Vol.43Issue(1) :75-77.

某项目基坑支护预警后应急处理措施及效果分析

Analysis of Emergency Response Measures and Effects After Early Warning of Foundation Pit Support in a Certain Project

杨杰 1方威威2
扫码查看

作者信息

  • 1. 南通经济技术开发区建设工程质量安全监督站,江苏 南通 226009
  • 2. 上海新东诚建设工程有限公司,上海 201516
  • 折叠

摘要

拉森钢板桩施工速度快,插入地层即具有强度,成桩到基坑开挖施工工期很短,但简易支护情况下,不加围檩或内撑,桩身产生的侧位移较大.论文通过一具体工程案例,详细分析该工程拉森钢板桩侧位移较大的原因,为避免类似问题的发生提供参考.

Abstract

The construction speed of larsen steel sheet pile is fast,and it has strength when inserted into the ground.The construction period from pile formation to excavation of the foundation pit is very short.However,in the case of simple support,without adding purlins or internal supports,the lateral displacement of the pile body is relatively large.This article provides a detailed analysis of the reasons for the large lateral displacement of Larsen steel sheet piles in a specific engineering case,in order to provide reference for avoiding similar problems.

关键词

拉森钢板桩/基坑支护/侧位移

Key words

larsen steel sheet pile/foundation supporting/lateral displacement