Analysis and Research on the Cost Difference of High-Rise Residential Buildings by Template Selection
The production and installation of cast-in-place structural formwork for high-rise buildings occupy a high proportion in the construction of the main project.Its resource consumption is large,and the construction cycle is long.After deducting the residual value of turnover materials,the average building area index is over 130 yuan/m2.Each cubic meter of concrete component requires formwork of 4~5m2,and the engineering cost accounts for about 30%of the total cost of concrete structure engineering.The labor investment accounts for 30%~45%,and the construction period accounts for more than 50%,It is crucial for the overall project progress and cost indicators.This article is based on the construction of high-rise residential projects,aiming to compare the applicability and cost of aluminum alloy templates with traditional steel wood composite templates.It analyzes and demonstrates the factors that affect the construction cost of high-rise residential buildings due to template selection,promotes the application of project planning and economic activity analysis results,and is conducive to refined cost management throughout the entire project process,achieving ultimate benefits.