Discussion on Application of Manual Drilling Pile Technology in Complex Geological Mountains at CliffEdge
Based on the summary of the construction experience of over 24m deep manual hole digging pile at the cliff edge of a project,this paper discusses the construction technology of manual hole digging pile on steep slope from the aspects of site treatment,environmental constraints,safety and quality requirements,etc.The case of using the original engineering pile as support for slope cutting construction is provided to ensure the smooth implementation of the manual hole digging pile of the project.
manual hole digging pileside slopeconstruction managementnarrow site