瓜步汛电排站扩建工程基础调整分析

扫码查看
瓜步汛电排站扩建工程属于堤外式电排站,初步设计泵室段基础方案采用 CFG 桩复合地基的基础处理方案,上部结构采用常规的分离式布局;通过计算分析,施工阶段提出了将泵房段基础调整为多桩型刚性复合地基的方案,上部结构同时调整为整体式布局.通过以上调整,既能节省工程投资,又能降低上部结构的沉降,增加结构的安全富余度;该工程案例可为堤外式电排站基础结构设计提供借鉴.
Analysis on Foundation Adjustment of Guabuxun Power Station Expansion Project
Guabuxun power drainage station is an outside dike-type power drainage station.In the preliminary design stage,the CFG pile composite foundation treatment scheme was adopted in the pump room.The superstructure was the usual drainage pump station layout,which used in conventional water conservancy projects.By computing,the paper puts forward the scheme of adjusting the pump room section foundation to multi-pile rigid composite foundation in the construction stage,and the superstructure is adjusted to the overall layout at the same time.Through the above adjustment,not only can optimize the project investment,but also reduce the settlement of the superstructure and increase the safety surplus of the structure.

off-bank type power stationseismic defensesfoundation treatmentrigid review foundation

唐正文、曾子

展开 >

佛山市南海区水利投资建设有限公司,广东 佛山 528000

中国电建集团成都勘测设计研究院有限公司,成都 610000

堤外式电排站 抗震 基础处理 刚性复核地基

2025

广东水利水电
广东省水利水电科学研究院

广东水利水电

影响因子:0.309
ISSN:1008-0112
年,卷(期):2025.(1)