Layout Plan of Deck Ventilation Pipe on Wind Turbine Foundation Construction Vessel
As for the wind turbine foundation construction ship,it is required to have the wide&spacious open construction deck,convenient for operation.But such vessels have a lot of ballast tanks,and the deck venting pipes layout is one difficult problem.This paper focuses on the research and design of eliminating the air-pipe head on the broad open construction deck,and analyzes the influence of different venting pipe arrangement on the performance and function of the ship.The best optimal scheme of unaffecting the operation function and the stability of the ship is selected to provide the design ideas for the broad wide deck of the subsequent similar ships.
wide open deckelimination of air-pipe headstability and function