摘要

以DP2 附加标志的平台功率管理系统为分析对象,从规范要求寻找设计要点,分析DP2 海上风电安装平台功率管理系统的配置,探讨电站在不同管理模式下发电机组的运行情况,以及配电板母排联络开关的分合闸状态,为相关设计部门提供技术参考.

Abstract

Taking the platform power management system with DP2 additional notation as the analysis object,the design key points are found from the rules requirements,to study the configuration of the power management system for DP2 offshore wind turbine installation platform,the operation status of the generator sets in different management modes and the on-off state of switchboard bus-ties are discussed,so as to provide technical reference for the relevant design departments.

关键词

风电安装平台/功率管理系统/动力定位

Key words

wind turbine installation platform/power management system/dynamic positioning