Study on Structural Optimization of Medium and Small-Sized High-Piled Beam-Slab Wharf
Based on a terminal project for tourism and leisure service,to achieve structural safety and reduced investment cost,the conventional high-piled beam-slab structure is reconstructed to be a new type of structure suitable for small and medium-sized wharves by optimizing the layout of pile foundation,adjusting the pattern of structural joint,adding high-rigidity berthing blocks and wave-retaining side plates.The comparative analysis of techniques and economy shows that the new structure can lower the project cost by 6.23 million yuan.At the same time,in view of significant spatial characteristics of the structure,further analysis and study are carried out for he principle of 3D computational model simulation,the selection of unit types,and the connection fitting between pile foundation and upper structure,and then guiding proposals are made,which will provide a reference for the structural design of similar projects.
high-piled beam-slab structuredesign optimizationpattern of structural jointberthing components3D calculation