Comparative Analysis of Traditional Technology and Visual-System Technology Adopted in Installation of Accropodes
In order to improve the construction technology of the breakwater with CLI Accropode armor structure,including the efficiency and quality of accropode installation,Skikda LNG Port reconstruction in Algeria and Tema container terminal in Ghana are selected to study the standard,inspection requirements and process of CLI accropode installation,analyze the traditional technology,as well as the technology assisted by Echoscope 3D sonar imaging visual system developed by Coda Octopus company in Britain.The above underwater installation processes are compared from the aspects of operable time,efficiency,safety level,economy,quality and accuracy.The research will provide a guideline for similar projects.