顶拉管技术是一种新型的非开挖管道施工工艺,在不同施工条件下均具有良好的适用性,文章针对顶拉管工艺的施工质量、造价等问题,进行了工艺原理的论述、质量缺陷改进以及造价水平的研究,同时对发展前景提出展望;采用工艺特点对比、问题成因分析、结合现场施工探索的方法,得出顶拉管在工艺优势、造价优势、缺陷规避方法等方面的结果;结论是顶拉管相较拖拉管工艺拥有较高的施工精度,又较顶管工艺在造价方面优势较大,施工过程中可通过进出洞止水、优先施加拉力等手段提高施工质量.
Research on Pipe Jacking-Pull Technology
Pipe Jacking-pull technology is a new technology of trenchless pipeline construction,which has good applicability under different construction conditions.In view of the construction quality,costing and etc.of pipe jacking-pull technology,an introduction to its process principle,quality defect improvement and costing level is made,complete with the developing prospects.The comparative analysis is carried out for the process characteristics,causes for the problems and on-site construction exploration means,which shows the advantages of pipe jacking-pull in process and costing as well as defect avoidance methods.It is found that the pipe jacking-pull has higher construction accuracy than that of pipe dragging process,lower cost than that of pipe jacking process,ensures higher construction quality by water-stop at work-hole and giving priority to tension force in the construction.

pipe jacking-pulltrenchlessprocess improvement

徐荣华、孟远

展开 >

上海交通建设总承包有限公司,上海 200136

顶拉管 非开挖 工艺改进

2024

港工技术
中交第一航务工程勘察设计院有限公司

港工技术

影响因子:0.262
ISSN:1004-9592
年,卷(期):2024.61(2)