大潮差无掩护海域高桩码头靠船构件安装技术研究

扫码查看
高桩码头是一种应用较为广泛的码头结构,属于透空结构,对波浪不发生反射.其结构轻,砂石料用量省,对地基的适应性好.大型高桩码头的上部结构尺寸大,在水文条件复杂的环境下,具有较大的施工难度和风险,对施工设备和施工技术要求高.本文依托国内大潮差无掩护海域某高桩码头的施工,在综合分析施工现场各类影响因素的基础上,优化调整靠船构件设计和安装技术,顺利解决了靠船构件安装时遇到的难题,节约了施工时间和费用,可为后续此类工程的施工提供参考.
Research on Installation Technology of Berthing Members of Piled Wharf in Unshielded Sea Area with Large Tide Range
As a widely used wharf structure,piled wharf belongs to permeable structure,does not reflect waves,and possesses the advantages of light structure,less consumption of sand and gravel,and high adaptability to foundation.Due to huge upper structure of large piled wharf,higher construction difficulty and risks exist under complex hydrological conditions,which leads to high requirements of equipment and technology.Based on the construction of a piled wharf in unshielded sea area with large tide range in China,the design and installation technology of berthing members are optimized and adjusted by fully analyzing a variety of field influencing factors,which successfully solves the problems encountered in the installation of berthing members,lowers construction time and cost,and provides a reference for the construction of similar projects.

large tide rangepiled wharfprecast concreteberthing membersinstallation technology

吴亮、陈先威

展开 >

中交第一航务工程勘察设计院有限公司,天津 300220

大潮差 高桩码头 预制混凝土 靠船构件 安装技术

2024

港工技术
中交第一航务工程勘察设计院有限公司

港工技术

影响因子:0.262
ISSN:1004-9592
年,卷(期):2024.61(3)
  • 6