Research and Application of Integral Binding and Lifting Technology of Reinforcing Steel of Large Prefabricated Circular Caissons
In order to solve the problems such as poor accuracy,low efficiency,high risks,and uncontrollable quality in the traditional binding and hoisting of steel bars,based on the construction of a open-sea caisson wharf in Maoming city,Guangdong province,a series of studies were focused on the key points and difficulties in the steel bar binding and hoisting of prefabricated caissons,which led to a kind of integral binding and hoisting technology of steel bars of large circular prefabricated caissons.This technology was analyzed and calculated from the aspects of structure system,stress,and working conditions.The optimized binding technology ensures the quality and safety of construction,and provides a reference for the reinforcement binding and hoisting of prefabricated caissons.
prefabricated caissonsintegral binding of reinforcing steelintegral lifting of reinforcing steel