极端天气下某防波堤工程索赔及保险赔付实践

扫码查看
南亚某离岸防波堤,按规范和合同要求施工,由于遭遇到极端天气,导致部分防波堤被冲毁,项目管理团队依据FIDIC条款,对极端天气进行界定,并开展防波堤施工期工程索赔和保险理赔,最大限度的减少极端天气对防波堤实施的影响,上述工程索赔及保险赔付实践可以为后续同类项目在遇到类似工况下施工期索赔及保险赔付提供借鉴.
Engineering Claim and Insurance Compensation of One Breakwater Project under Extreme Weather
An offshore breakwater in South Asia was constructed in accordance with the specifications and contract requirements.The extreme weather caused the breakwater being destroyed by waves.The project management team firstly defined the extreme weather based on FIDIC clauses,and then carried out the engineering claims and insurance compensation of the breakwater project during the construction period,which minimized the impact of extreme weather on the breakwater construction.The aforementioned claims may serve as a reference for the projects in the event of similar working conditions.

extreme weatherbreakwaterconstruction periodengineering claimsinsurance claims

李春潮、郭赞辉、李孟斌

展开 >

中国港湾工程有限责任公司,北京 100027

极端天气 防波堤 施工期 工程索赔 保险理赔

2024

港工技术
中交第一航务工程勘察设计院有限公司

港工技术

影响因子:0.262
ISSN:1004-9592
年,卷(期):2024.61(5)