首页|自动化集装箱码头总承包项目的风险管理

自动化集装箱码头总承包项目的风险管理

扫码查看
介绍了自动化集装箱码头总承包项目的特点、总承包的模式,以及自动化集装箱码头总承包项目执行过程中的风险、及其风险防控措施.以振华重工所承建的自动化码头总承包项目为例,具体探讨分析了自动化集装箱码头总承包项目执行过程中的风险特点和范围,并提出了防控的具体措施.自动化集装箱码头总承包项目风险是港机总承包商所面临的由单一港机设备风险向码头设施设备自动化总承包系统风险的转变,也是港机总承包商承包总承包项目所必然面对的现实情况.通过对自动化集装箱码头总承包过程中所经历的各类风险的应对处置,积累了中国港机重工总承包单位为代表的中国重工制造走向全球提供了风险防控和处置的经验,探索了防控和处置总承包风险的路径遵循,对中国中国重工制造走向全球具有重要的意义.
Risk Control of General Contracting of Automated Container Terminal Project
By analyzing the characteristics,general contracting mode,the execution risks and the countermeasures of automated container terminal EPC projects,based on a general contracting project of automated terminal by Zhenhua Heavy Industry(Group)Company Limited,a detailed analysis was carried out for the risk range and characteristics in the general contracting process of automated container terminal,which led to the specific countermeasures.The above risks were defined as the risks encountered by the general contractor of port machinery,that is,the risks of single port machinery turned to the systematic risks of general contracting of automated terminal facilities.By dealing with all kinds of risks in the general contracting of automated container terminal,the experience in project risk control and disposal was accumulated,which assisted Chinese heavy equipment manufacturing enterprises such as Chinese general contractors of port machinery in going abroad.The exploration of the way to prevent,control and dispose general contracting risks is of great significance for China heavy industry stepping into global market.

general contracting project of automated container terminalexecutionrisk control

陈文卫

展开 >

上海振华重工(集团)股份有限公司,上海 200125

自动化集装箱码头总承包项目 执行 风险管理

2024

港工技术
中交第一航务工程勘察设计院有限公司

港工技术

影响因子:0.262
ISSN:1004-9592
年,卷(期):2024.61(6)