首页|歇山顶组合殿座正殿加抱厦琉璃屋面施工工艺剖析

歇山顶组合殿座正殿加抱厦琉璃屋面施工工艺剖析

扫码查看
介绍歇山顶组合殿座古建琉璃屋面施工重点部位,主要包括尖山、圆山正脊对博缝板的标高要求,连接正殿、抱厦二者屋面的的天沟和窝角沟,以及其金刚墙标高、囊向的详细实施过程.重点内容包括:歇山屋面分中控制线,屋面瓦瓦样活过程,琉璃屋脊的详细要求;各种屋脊之间、脊与瓦面之间,它们既独立又关联的关系.通过真实的图片、简单的叙述,予以展现、说明.
Analysis of the Construction Technology of Adding Glass Roof to the Main Hall of the Xieshop Combination Hall
Introduce the key parts of the construction of the ancient building's glazed roof for the Xieshan Mountain Combination Hall,mainly including the elevation requirements of the ridge of the Jianshan and Yuanshan to the Bo joint board,the gutter and Wojiao gutter connecting the roofs of the main hall and the Baoxia,as well as the detailed implementation process of its diamond wall elevation and envelope direction.The key content includes:the control line for the separation of the Xieshan roof,the process of roof tile sampling,and detailed requirements for the glazed roof ridge;The relationships between various ridges and between ridges and tile surfaces are both independent and interrelated.Present and explain through real pictures and simple narratives.

Xieshan MountainGlass Tile SurfaceTiangouPit Angle GrooveCystic DegreeBo Xiu

盖玉东

展开 >

故宫博物院

歇山顶 琉璃瓦面 天沟 窝角沟 囊度 博缝