The water drainage system of nuclear power plant is an important part of the long-term stable operation of the unit[1].Through analyzing and studying the water diversion system scheme set up in the CAP1000 series third-generation nuclear power unit project,the optimization scheme of the water diversion system for the turbine building of 1000MW nuclear power plant is proposed.The results show that the optimal design scheme meets the design requirements of nuclear power plants,and the results can also provide reference for other nuclear power plants in the future.
关键词
核电/常规岛/疏放水系统优化/冲洗水回收/良好借鉴
Key words
nuclear power,Regular island/Drainage system optimization,Rinse water recovery,Good reference