港口装卸2024,Issue(2) :58-60.DOI:10.3963/j.issn.1000-8969.2024.02.020

一种大型港口起重机整机滚装方式装卸船方案

A kind of Scheme for Handling Ship by Whole Roll-on Roll-off Method for Large-scale Port Crane

牟寿堂 韩中成 陈凡 林润泽
港口装卸2024,Issue(2) :58-60.DOI:10.3963/j.issn.1000-8969.2024.02.020

一种大型港口起重机整机滚装方式装卸船方案

A kind of Scheme for Handling Ship by Whole Roll-on Roll-off Method for Large-scale Port Crane

牟寿堂 1韩中成 1陈凡 1林润泽1
扫码查看

作者信息

  • 1. 青岛海西重机有限责任公司
  • 折叠

摘要

大型港口起重机设备在制造厂及用户码头具备条件的情况下,通常在制造厂完成绝大部分的安装及调试工作后,采用整体滚装方式进行装船、卸船.结合工程实践,给出了一种大型港口起重机整机滚装方式装卸船方案,介绍了船舶选择、施工过程及其关键技术要点.

Abstract

Large-scale port crane equipment in the manufacturing plant and user terminals with conditions,usually in the manufacturing plant to complete most of the installation and commissioning work,using the whole roll-on roll-off method for handling ships.Combined with engineering practice,a large-scale harbor crane whole roll-on roll-off mode handling program is given,which introduces the ship selection,construction processing and its key technical points.

关键词

大型/港口起重机/整体滚装/船舶选择/施工过程

Key words

large-scale/port crane/whole roll-on roll-off/ship selection/construction processing

引用本文复制引用

出版年

2024
港口装卸
武汉理工大学 中国工程机械学会港口机械分会

港口装卸

影响因子:0.186
ISSN:1000-8969
参考文献量2
段落导航相关论文