一种大型港口起重机整机滚装方式装卸船方案
A kind of Scheme for Handling Ship by Whole Roll-on Roll-off Method for Large-scale Port Crane
牟寿堂 1韩中成 1陈凡 1林润泽1
作者信息
摘要
大型港口起重机设备在制造厂及用户码头具备条件的情况下,通常在制造厂完成绝大部分的安装及调试工作后,采用整体滚装方式进行装船、卸船.结合工程实践,给出了一种大型港口起重机整机滚装方式装卸船方案,介绍了船舶选择、施工过程及其关键技术要点.
Abstract
Large-scale port crane equipment in the manufacturing plant and user terminals with conditions,usually in the manufacturing plant to complete most of the installation and commissioning work,using the whole roll-on roll-off method for handling ships.Combined with engineering practice,a large-scale harbor crane whole roll-on roll-off mode handling program is given,which introduces the ship selection,construction processing and its key technical points.
关键词
大型/港口起重机/整体滚装/船舶选择/施工过程Key words
large-scale/port crane/whole roll-on roll-off/ship selection/construction processing引用本文复制引用