Comparative Analysis of Production Process Switching Methods in Bulk Cargo Ports
During the operation of bulk cargo terminal,there are frequent process starts and stops on site,which involves a lot of process switching.Each process start and stop needs to consume a large amount of electric energy,and causes a certain impact on the equipment.Comparing and analyzing the traditional process switching method and the"hot switching"method of production process,the results show that the"hot switching"method of production process can reduce the frequency of starting and stopping of the equipment,reduce the energy consumption,and reduce the impact on the equipment.
bulk cargo portsprocess hot switchingenergy efficiency analysis