Quality Control of Concrete Appearance of Pier Shaft during Climbing Construction of MORACICA Bridge
The piers of the MORACICA Bridge on the Smokovac-Uvac-Matesevo Highway Project is divided into two types:the main pier P2~P4 is with the structure of double thin-walled section for the top 90 m,and of box section for the lower part;the P1,P5 piers are double thin-walled section.The Bridge crosses E80 Highway,the main trunk road for eight countries,thus its appearance has become the focus of concern.During the climbing formwork concrete construction of pier shaft of the MORACICA Bridge,the smoothness,gloss,edges of piers,and the appearance of the finished product are the focus of technical control so as to improve the appearance of the bridge quality and social influence.
bridge engineeringclimbing form constructionconcrete appearancesmoothnessglossedges of pier shaftprotection of finish