Discussions on Design and Construction Technology of Cableway Bridge of Shuangbao Extra Large Bridge
The cableway bridge of Shuangbao Bridge has a design span of 245.52 m and a height difference of 3 m between the cross-strait cable saddles,which serves as a temporary passage for the construction of the Shuangbao Bridge.Because there is no relevant technical standard for the design and construction of the cableway bridge,in the paper,based on the design and construction experience of the bridge,the selection of calculation parameters,theoretical calculation analysis,and on-site construction control parameters are analyzed,which is expected to provide some reference for subsequent design and construction of similar cableway bridge.
bridge engineeringcableway bridgeBNLAS softwarebridge deck cablestabilizer cableanchorage systemdesign and construction