Scheme Design of the Huangge West Interchange and Calculation Analysis of the Ramp Weaving Segment
The preliminary survey,preliminary design,and detailed engineering design of the Huangge West Interchange in the Shiziyang Link Project have been successfully carried out.Based on this,the experience in the selection of the interchange schemes and detailed engineering design are concluded and analyzed.The selection and modification process involved in scheme of the Huangge West Interchange are introduced in detail,and the ramp weaving segment is calculated and analyzed using a specific case study,verifying the feasibility of the scheme.The paper can serves as a reference for similar interchange scheme designs,adjustment of ramp layout,and ramp weaving calculations.
Shiziyang Link Projectscheme design of interchangeadjustment of ramp layoutcalculation of capacity for the main ramp weaving segment