重载交通下分车道管理老路路面改造方案研究
Research on the Reconstruction Scheme of the Old Road with Divided Lane Management under Heavy Load Traffic
李林 1程全2
作者信息
- 1. 深圳市交通公用设施建设中心 深圳市 518040
- 2. 中交第二公路勘察设计研究院有限公司 武汉市 430056
- 折叠
摘要
以G30连霍高速公路哈密至吐峪沟段改扩建工程为例,通过不同分车道管理后的服务水平和车道数需求进行比较,拟定分车道管理的运营方案,进而明确不同车道的车型分配和轴载作用次数,达到充分利用既有老路的剩余使用寿命目的,避免路面的过度利用或改造不彻底情况.
Abstract
Taking the reconstruction and expansion project from Hami to Tuyugou section of G30 Lianyungang-Khorgos Expressway as an example,by comparing the service level and lane number demand after different lane division management,the operation plan of lane division management is drawn up,and then the model distribution and the number of axle load functions of different lanes are clarified,so as to make full use of the remaining life of the existing old road to avoid excessive or incomplete transformation of the road surface.
关键词
老路路面改造/货车比例大/服务水平/车道数Key words
old road surface renovation/large proportion of trucks/level of service/number of lanes引用本文复制引用