Quality Control Measures for Hole Forming of Super Long and Large Diameter Cast-in-place Pile
Large-diameter and super long cast-in-place piles have been widely used in some large-scale and difficult key projects.The pile foundation for main pier of the Qilu Yellow River Bridge adopts super long large-diameter cast-in-place piles.The hole forming quality control of super long and large diameter cast-in-place pile foundation is the key and difficult point of the early stage construction of the project,which is systematically expounded in the paper,hoping to provide some help for the project constructions in the Yellow River area.
bridge engineeringcast-in-place pilehole-forming of pile foundationquality control measures