首页|Design and analysis of the tunnel connecting the beamcorridor and the spectrum hall of the CSNS

Design and analysis of the tunnel connecting the beamcorridor and the spectrum hall of the CSNS

扫码查看
There is a tunnel connecting the beamcorridor and the target station in the spectrum hall in the CSNS project. The length of the tunnel is about 20 m. The shielding design of the tunnel is very significant for the persons working in the spectrum hall beca

CSNSdose rateoptimizationcable ductshieldingFLUKA

屏蔽设计 隧道 大厅 连接 谱分析 ISIS 设计参考 蒙地卡罗

2011

高能物理与核物理
中国物理学会

高能物理与核物理

SCI
ISSN:0254-3052
年,卷(期):2011.35(1)