甘肃科学学报2024,Vol.36Issue(4) :62-67.DOI:10.16468/j.cnki.issn1004-0366.2024.04.009

双幅连续刚构桥施工阶段风荷载研究

Wind load study during the construction phase of a double-width continuous rigid frame bridge

吕卫军 叶茂 白桦
甘肃科学学报2024,Vol.36Issue(4) :62-67.DOI:10.16468/j.cnki.issn1004-0366.2024.04.009

双幅连续刚构桥施工阶段风荷载研究

Wind load study during the construction phase of a double-width continuous rigid frame bridge

吕卫军 1叶茂 2白桦2
扫码查看

作者信息

  • 1. 陕西省交通规划设计研究院有限公司,陕西西安 710065
  • 2. 长安大学公路学院,陕西西安 710064
  • 折叠

摘要

为了研究双幅高墩连续刚构桥的风荷载特性,以陕西洛河大桥为工程背景,通过风洞测压试验,探讨了该连续刚构桥桥墩风压系数随施工阶段结构形式的变化规律,并基于计算流体动力学(CFD)数值模拟,研究了最大双悬臂状态上、下行双幅桥风致干扰效应随其间距的变化规律.结果表明:桥墩最大负压发生在最大悬臂施工阶段,对压力系数的影响明显;双幅桥之间的风致干扰效应随着间距的增大越来越弱.

Abstract

In order to study the wind load characteristics of the double-width high-pier continuous rigid frame bridge,taking the Luohe Bridge in Shaanxi Province as the engineering background,the variation law of the wind pressure coefficient of the continuous rigid bridge pier with the structural form in the construc-tion stage was discussed through the wind tunnel pressure measurement test,and the variation law of the wind-induced interference effect of the maximum double-cantilever state with the spacing of the double-am-plitude bridge was studied based on the numerical simulation of computational fluid dynamics(CFD).The results show that the maximum negative pressure of the pier occurs in the construction stage of the maxi-mum cantilever and has an obvious influence on the pressure coefficient,and the wind-induced interference effect between the double-width bridges becomes weaker and weaker with the increase of the spacing.

关键词

连续刚构/风洞试验/风压系数/干扰效应

Key words

Continuous rigid construction/Wind tunnel testing/Wind pressure coefficient/Interference effects